Skip to Content
View All
Pause
  • ApplyDown Chevron
    • Activities and Programs
    • Building Permits and Inspections
    • Burning Permit
    • Dog License
    • Facility Booking
    • Jobs at the City
    • Preauthorized Tax Payments or Deferments
    • Speak As a Delegation Before Council
  • PayDown Chevron
    • Accessible Parking Permits
    • Recreation Programs
    • Swimming Passes
    • Taxes
    • Transit Tickets
    • Utility Bills
  • ReportDown Chevron
    • Bylaw Infraction
    • Customer Service Feedback
    • Dogs
    • Illegal Dumping
    • Missed Garbage Pickup
    • Outdoor Burning
    • Service Request
Close icon

City of West Kelowna Logo

Contact Us Main menu icon
  • Our Community
    • Annual Report
    • Bears and Wildlife
    • Bylaw Compliance
    • Capital Projects
    • Community Well-being
    • Drainage, Flooding and Storm Sewers
    • Emergency Preparedness
    • Engage With Us
    • Fire and Rescue
    • FireSmart
    • Housing
    • Official Community Plan
    • Police (RCMP)
    • Roads, Sidewalks and Street Lights
    • Sanitary Sewers and Wastewater
    • Snow and Ice Control
    • Transit
    • Water
  • Building, Business and Development
    • Bids and Tenders
    • Building Permits and Inspections
    • Bulletins and Forms
    • Business Directory
    • Business Licences
    • CityView Portal
    • Economic Development
    • Maps and GIS
    • Planning and Development
    • Procurement and Purchasing
    • Subdivisions
    • Water Meters
  • Parks, Recreation & Culture
    • Beaches and Boat Launches
    • Book a Facility or Field
    • Cemetery
    • City Events
    • Financial Assistance Programs
    • Johnson Bentley Memorial Aquatic Centre
    • Online Registration
    • Parks Amenity Donation Program
    • Parks and Trails
    • Recreation Guide
    • Recreation and Culture Facilities
    • Sports Courts and Fields
  • City Hall
    • Accessibility
    • Agendas and Minutes
    • Budget
    • Bylaws
    • City Hall
    • Contact Us
    • Council Committees
    • Disclaimer & Privacy Policy
    • Employment
    • Freedom of Information
    • Mayor and Council
    • News and Alerts
    • Plans and Strategies
    • Property Taxes
    • Public Notices
    • Speculation Tax
    • Utility Billing and Rates
    • Webcasts
  • I Want To...
Question MarkAsk West Kelowna

Shannon Lake Road

Phase three begins on the Shannon Lake Road Active Transportation Corridor Project

  • Open new window to share this page via Facebook Facebook
  • Open new window to share this page via LinkedIn LinkedIn
  • Open new window to share this page via Twitter Twitter
  • Email This page Email
Show or hide navigation More
Back to Search
Shannon Lake Road roundabout

FOR IMMEDIATE RELEASE
Tuesday, Aug. 27, 2024

Crews are making good progress on the construction of the multi-use pathway and roundabout along Shannon Lake Road as part of the Active Transportation Corridor Project.

Beginning this week, an intermittent single-lane alternating traffic pattern will be in effect on Shannon Lake Road from Shannon Ridge Drive to Swite Road, weekdays from 7:00 a.m. to 6:00 p.m. as crews begin work on phase three of the project.

Road improvements for phase three include a multi-use pathway on both sides of the roadway, stormwater upgrades, streetlighting, landscape boulevards and the installation of a pedestrian-activated crosswalk.

The detour on Shannon Lake Road via Shannon Way to Woodstock Drive to Shannon Place and Shannon Ridge Drive will remain in place as crews work to complete construction of the roundabout at the Asquith Road intersection. Access will be maintained for the Bulk Water Station.

Please note the construction schedule is subject to weather conditions, contractor schedule changes and other factors.

While work is underway, motorists are advised to leave extra time to get where they need to go. The single-lane alternating traffic pattern is necessary to allow crews to work as quickly as possible while ensuring public and crew safety.

Motorists are also advised to drive with caution through the detour, follow all posted speed limits and follow directions of traffic control. Pedestrian and emergency services access will be maintained at all times and cyclists are encouraged to follow posted detours or dismount through the construction zone.

The City of West Kelowna thanks residents and businesses for their patience and understanding during construction.

Plan your commute – Shannon Lake Road Phase 3 map

More information:

  • For more details about the Shannon Lake Road Active Transportation Corridor Project, visit OurWK.ca/shannonlake
  • Remain signed up at westkelownacity.ca/subscribe to receive project updates directly to your inbox or follow us on Twitter, Facebook and Instagram.

Contact Us

Subscribe to this Page
Subscribe

    City of West Kelowna Footer Logo

    © 2024 The City of West Kelowna, 
    3731 Old Okanagan Highway, 
    West Kelowna, BC, V4T 0G7
    Email us | Phone: 778-797-1000

    Facebook     Instagram     LinkedIn     X     YouTube    

    A to ZAccessibilityDisclaimer and Privacy PolicySitemapContact Us

    Browser Compatibility Notification

    It appears you are trying to access this site using an outdated browser. As a result, parts of the site may not function properly for you. We recommend updating your browser to its most recent version at your earliest convenience.